PIPELINE PROJECTS

revamp
apa alarm rat.png

Client:

Location:

Year:

Project  Name:

Project Value:

Project Scope:

AGM Responsibilities:

 

 

 

AGM Contract Value:

APA Group

Brisbane, QLD

2021

APA - Alarm Rationalisation Engineering Services

Drive standardisation of alarms and enable governance of the alarm systems

• Reduce the overall alarm defect count
• Reduce and sustain alarm rate
• Ensure controllers have access to up to date alarm information
• Ensure all alarms have accurately documented setpoints, design basis and trip information.
• Quantify and reduce overall defects
• Ensure all new assets perform in line with APA’s alarm philosophy

$1.6M

Anchor 1
APA EMERG PIPE.png

Client:

Location:

Year:

Project Summary:

Project Value:

AGM Responsibilities:

 

 

 

 

 

AGM Contract Value:

APA Group

Australia

2020

Emergency Response Pipe

$186K

  • Establishment of pipe specification(s) for pipelines coverage

  • Evaluation of catalogued emergency response pipe (certificates, mechanical testing, condition, and storage)

  • Pipeline spares gap analysis (from FCP requirements)

  • Update of Pipeline Register

  • Facilitating risk categorisation of non-compliances for action.

$186K

Working with Financial Documents

Client:

Location:

Year:

Project Summary:

Project Value:

AGM Responsibilities:

 

 

 

 

AGM Contract Value:

APA Group

Brisbane, QLD

2022

Environmental Data Improvement Project Resource

  • Oversee the actioning of FY22 Improvements as recommended by EDIP Data Verification Stream.

  • Provide improvements to data sources such as using PI data Link.

  • PLC logic updates

  • Installation of new measuring systems.

$95K